Black Sea Oil & Gas’ MGD Project consists of 5 production wells (1 subsea well at Doina field and 4 platform wells at Ana field) a subsea gas production system over the Doina well which will be connected through an 18 km pipeline with a new unmanned production platform located over Ana field. A 121 km subsea pipeline will ensure the delivery of the gas from Ana platform to the shore, where a 4.1 km underground pipeline will connect to the new gas treatment plant (GTP). The processed gas will be delivered into the NTS operated by Transgaz at the gas metering station to be found within the GTP.