I have been working on building a Bitcoin mining farm because I think BTC will pump and I am holding all of the Bitcoins that I am mining, and now I’ll continue to expand the VoskCoin mining farm, so here’s what is new, going good, and going bad lol — Buy your own miner here – https://voskco.in/am

Best PDU for mining – https://voskco.in/aPDU
ETCMC plug and play nodes – https://voskcointalk.com/t/etcmc-initial-thoughts-and-node-coupon-code/45561?u=voskcoin
The Best Miners to Buy for 2024 – https://youtu.be/VZf2Hh9UnSs?si=S4zIsN50lWh_Zaig
Complete ASIC Mining Guide – https://youtu.be/UvmXso0h3Oo?si=s1S2kpTsL2M_yalR
Foghashing makes immersion mining systems! https://voskco.in/fh
Full mining farm build playlist – https://youtube.com/playlist?list=PL4dnwHTjcf-9qfOEekcjPwqJqgkO455f-&si=O7scWDdBp_ismEVG

Building a Bitcoin mining farm has been difficult over the last year, but it’s the best way to earn passive income in 2024, and I truly believe that, and am putting my money where my mouth is. Expanding the VoskCoin mining farm into immersion mining, and then also a lot of altcoin mining to diversify our BTC mining farm.

Check out the Deployment of our DCX Immersion Mining Enclosure – https://youtu.be/tZ3Q4cK6S2w?si=xo2I1oAvSQYYrnOa
How to Mine with Braiins – https://youtu.be/rgs-MQNxfuc?si=Z5w3QJFSs03_-bWJ

⏰ Timestamps ⏰
00:00 New additions to the mining farm!
00:58 Huge electricity hazard on the farm
02:53 Am I still bullish on crypto mining?
04:44 New deployments on the mining farm
07:40 Expanding my electrical capacity
10:13 Why I’m mining for efficiency vs overclocking
13:26 Using the Field Building for mining
17:42 Using inefficient miners to heat my building!
18:50 Installing new miners on the farm!
22:42 HDD mining update
23:40 VoskCoin Mining Farm update

VoskCoin links, social media, forum – http://voskco.in/24

VoskCoin is for entertainment purposes only and is never intended to be financial investment advice. VoskCoin owns or has owned cryptocurrency and associated hardware. VoskCoin may receive donations or sponsorships in association with certain content creation. VoskCoin may receive compensation when affiliate/referral links are used. VoskCoin is home of the Doge Dad, VoskCoin is not your Dad, and thus VoskCoin is never liable for any decisions you make.
#Cryptocurrency #Bitcoin #VoskCoin #CryptoMining #BitcoinMining #PassiveIncome #MiningFarmTour #Braiins #ImmersionMining

It has been a crazy 24 hours uh so yo I’m BOS you’re on the boscoin YouTube channel and uh heading over to the farm right now loading up the farm mobile and uh we just got a new note in okay Noe is basically uh in this case a custom

Computer that earns crypto in some way shape or form we’ve also got some new hardware devices uh for the farm oh and you know also a new Miner Perfect all right we’ve got a lot to unpack and I mean Figuratively so I know I put my name on my shirt shirts I don’t forget it but when it comes to vas coin right we do a couple things we make videos right we we work on the Vos coin YouTube channel the content creation side and then we’ve

Also been building the vcoin mining Farm where Bitcoin mining is the backbone uh but altcoin mining is a very serious part of our mining Farm as well and right here behind me okay is my meter and the electric company messed up the meter install or the meter was broken uh

To begin with but basically uh what happened is the meter socket was bad the voltage was reading was literally low it was causing instability on some of the miners thankfully we figured this out me and my electrician uh but the scariest part is this was potentially a fire hazard all

Right and uh that’s terrifying because this meter is on the building and if you look at the other uh electrical services we have on the boscoin Moni Farm then you’ll know that they’re basically standoff Services uh they just literally stand there on their own and then we pipe the electricity into the uh

Buildings this is because my electric company will not set the meter bases on these buildings because they’re not permanent structures because they are not on concrete but this is concrete so this is on here and ironically my attached service was a fire hazard so let me run you through what’s new in

Here and what I’m doing with the boscoin mining farm and why I think to be frank in a way it’s like Do or Die time when it comes to crypto Min so there’s all the Bitcoin ETF craziness right and coin prices are you know up across

The board and at a glance you’re like okay great awesome snd it B run time been waiting years for this to happen again right but what some people don’t understand excuse the helicopter by the way if you guys can hear that but what you know some what some people aren’t

Thinking about and and this is what I’m kind of focused on and thinking about is minor prices are not reflecting the current market and people are even more cautious especially about when it comes to mining but especially Bitcoin because the Bitcoin having is is closing in and that means the amount of Bitcoins

M per day is be cut in half and I personally have been slowing down a bit um along with just to be frank dealing with unique challenges here on the farm so we hopefully are going to be able to basically Implement a fix to get the uh

Digital shovel working uh by the end of the week but we’re excited to hopefully get that ironed out uh but you know when it comes to of the farm right and and kind of what we’re doing you know I’m I’m full steam ahead even if it’s not just simply adding more

Bitcoin miners I got a couple s21s on the way uh and that’s a good way to you know just keep adding to my Bitcoin mining hash rate because when Bitcoin hits a new all-time high you best believe the miners are going to be more expensive than they are right now even

After the Bitcoin having I think personally right it’s just like most people in crypto believe the Bitcoin is going to go up uh yeah I believe you know bitcoin’s going to go up too uh and if I believe that then miners are going to go up uh in price so uh we’re still

Working on our new deployments I’m going to get these erected on this concrete pad uh that we poured hopefully by the end of this week but we’ got everything wired up for it uh so make sure to stay tuned for for that cuz to be frank I think that that

That’s going to be crazy when when we get these all deployed um I’ve been working hard towards a immersion you know liquid cooled mining deployment here um but I was really sped up on this because of the Pod going down and I had miners with nowhere to go and that’s a

Big reason why I added a lot of electricity uh to the vcoin fuel building or vcoin h Q as uh We’ve recently rebranded it instead of just the field building and I used to make fun of places you know they call place like hey welcome to Orange I’m like why

Why’ you name it orange orange my favorite color it’s like why’d you name it the field building it’s the building in the field like jeez that became what I used to make fun of but yeah this thing has been running great uh so far um interesting feedback I got is

Somebody was like Hey like by putting your ethernet cables like that they they’re going to just get this gravity pressure on them um that’s true and my initial thought is like well I’ll put something on there to support them um I just don’t think that’s really too

Possible Right other than if I just kind of and I want to redo these wires and make them all the same color and bundle them right here and that would alleviate some of this you know negative downward gravitational force that’s taking place uh but you know it’s just it’s always a

Process everything’s all over the place in here need to get this this is the other dry cooler so you see that massive one outside that one’s pretty big too uh and that one is for this uh emerging container and then this is for the other immersion uh container that we’re going

To deploy right uh and so these big containers right like no this one it nearly takes a 55gal drum of immersion uh mining coolant so because of all this stuff going on it’s been one of the main reasons why um I’ve added more electricity to the V Queen HQ it’s no

Secret I Love mining which naturally means that I love or at least need mining rakes that’s where Asic Marketplace comes in they sell all different types of cryptocurrency mining RS they get them to me quickly which makes the difference with my Roi and you know what else helps the ROI if

You punch in the code Vos coin to save some coin the next time you order a minor from them uh and so you know what did I add and why uh so um if you look in the corner uh so I’m running all these wires from the panel over to the corner and

That’s going to function as just additional electrical capacity in that building um I’m also throwing meter boxes on there so that’s going to double as a workbench testing bench uh for Vasco miners in the future much like I designed the other Corner which we first fun dubbed it the Caspa mining Corners

Cuz those miners pretty much just got parked there and haven’t really moved since um we’ve been kind of overburdened with miners uh for a while and you know with miners trickling in and then having some issues with mining infrastructure uh it it’s made mining more difficult over the last year

But it was even just simply year ago that I just plugged in my first Bitcoin miner here on the basically 2.0 boss coin mining Farm I guess 3.0 2.0 wasn’t really even a 0 it was like a 0.5 it was worse than my first Farm but I knew that

It was a stop Gap it it was my garage I wasn’t supposed to be mining in there as long as I was but without recapping my whole story I hit every roadblock it feels like they they have available uh but yeah adding more electrical capacity over there in the corner obviously

Running that from the panels that we’ve since repaired the meter uh base here in the building and then we added a second panel because I cut uh I wouldn’t say I cut corners but I I made budget cuts I was really constricted in budget last winter and I was like Hey electrician

Guy how can I get this build down he’s like well you don’t need 400 amps of electricity in here so let’s just put in one 200 amp panel and then you can add another 200 amp panel in the future uh if you should so be inclined or needed

Or whatever so I just did exactly that uh so adding that second panel opens up another 200 amps for me but I don’t have any air flow in that building that building was not designed and not planned to be a big mining building I’m really using it as overflow

But right now I’m pulling about 150 amps of electricity actually it’s going to go up when we plugg The Miner in that we just brought over here so know over 160 amps of electricity just for mining okay and that’s overflow that those those are miners that are supposed to be either

Here in liquid or aircooled in the podt but they’re not due to numerous reasons issues roadblocks hurdles whatever I’m going to continue freeing up mining Space by deploying more and more miners into liquid and and these are permanent deployments uh you know on this thing I’ve got 400 amps of uh singlephase

Electricity obviously I’m wiring all this stuff up on like 240 voltage I I put all these every other service was built out beginning you know so two panels here uh 200 amps on each and uh going to get these all set up situated I’m I’m tuning everything for efficiency

And that means that I’m trying to maximize my return against my electric my electricity bill um and you know this is we could talk about this one for like 30 minutes but just briefly this has been asked to me a few times recently right and so if you truly believe in

Bitcoin and everything why wouldn’t you crank your miners up maximum speed right overclock them and M as much Bitcoin as you possibly can right now because generally speaking today you will mine more Bitcoin than you will tomorrow because Bitcoin mining difficulty seems to just increase forever this year it’s more difficult

Than it was last year the Hing is going to hit bitcoin’s probably going to pump sooner or later and Bitcoin will continue to hit new alltime highs and Mining difficulty so theoretically based on that you should maximize your Bitcoin miners or at least have them turned up

You know a bit more than the most efficient settings but for me one thing I really like is one density the more efficient I make my miners I’m basically mining as much Bitcoin as I can with them per you know the lowest power consumption I have the lowest electrical

Footprint here uh uh and then I have the highest efficiency so I can deploy more Miners and they are mining more Bitcoin per the Watts of you know electricity I’m consuming this also gives me much more viable operation things get really tight something bad happens you know I’m

More in the green than somebody who’s operating a less efficient mining operation it’s a more conservative approach um by a few metrics but I’m building my farm you know for tomorrow I’m building it for longevity and I’m building it with the fact that it’s going to be pretty difficult for a lot

Of the previous generation Bitcoin miners like the ant minor s19 series to break even after the Bitcoin having the depending on the Bitcoin price so just some things to kind of think about and chew on and and keep in mind there’s a lot of different ways to go about this

This is nothing short of basically a strategy game in my mind uh I’m just looking at my pieces on the board and trying to make the best moves I think that I can to set my operation up for Success long term it also minimizes my

Input because I run out of time on all the projects and things I need to work on every single day uh so if I can’t get through everything I want to do every day and then I’m you know turning these up and I may need to turn them down

Later or you know whatever I’m only making everything more difficult for me I’m setting these up once I’m fine- tuning them okay see the two and the tuning tuning I going crazy was I trying to make a joke there can I even keep up with my own mind anymore maybe I’m short

Circuited but anyway that’s kind of the situation that’s kind of where we’re at uh so bringing it back to the fuel building and the electricity deployment we’re adding C over there in the corner right we’re adding additional 240 voltage circuits 30 amps and then in addition to that I’m running another

Line upstairs so that’s going to basically mirror the 30 amp 240 voltage Outlet I have upstairs it’s just going to give me another 30 amps to run Bitcoin miners up there it’s going to give me more versatility uh with how I finish that room uh move me forward and just it’s

Just better to have another 30 amps up there uh because the lower level is getting very hot uh depending on the temperature outside and I could basically easily stuff another couple miners cuz 30 amps is essentially two miners uh you know at normal settings that gives me the ability to put two

More miners upstairs here in the cold months uh I really appreciate and clearly utilize the Overflow it’s not something I always want to be doing or leaning on uh but it’s been something that I’ve been forced to do last winter and this winter so I will plan

Proactively that I may be doing this again next winter as well not the plan but plan for the worst and then obviously we’ve expanded the panel with most of the juice coming out of panel a panel B is where we’re going to run most of the new Outlets out of because again

We we are essentially maxing out panel a uh so panel B is giving us another 200 amps of electricity uh to work with here and part of that 200 amps will be tapped into at a later time uh for some future building expansions and plans and things

Like that but I as always especially I need to tell myself dude one step at a time or just two steps or three steps not as many steps as you’ve been doing okay uh so then in the back of the what we call the RV garage uh tall tall

Garage in here uh it’s pretty pretty cool pretty interesting the way we ran the wires up and over uh was more expensive to build everything this way but it gives us crazy versatility with going vertical um if we should ever choose to do so uh because one way that

This could be utilized is basically a massive mining wall uh and or RV storage and things like that uh so we’ve been working all year to try to get this place cleaned up situated do some of the finishing steps like I have contemplated you know how I want to paint it if at

All insulation wall covering am I going to do anything on the floor like a poly Spar deck epoxy kind of running through that looking at the budget seeing what’s realistic what I have time to add to my plate as far as a project to manage and what I can literally uh you know

Feasibly finan uh but we’ve been slowly getting closer uh on that front with everything but in the back of it we’re adding uh several additional circuits really a lot of juice right there we’ve run three more 30 amp 240 voltage circuits uh you can see one is already

Wired the others are about half wired at this point uh they’re going to be on meter boxes just for fun I’ve got all these things to give me nice real-time readouts fun for Content it’s a bit Overkill to be honest uh running the meter boxes and then hooking up uh these

Alter pdus which I’ve really come to like because they have a great form factor right we’ve got a link in the video description below use your boy code and get uh you know these Bas basically shipped for like 100 bucks they’re cheaper than other options uh

They work great and they have a really cool little like LCD screen on them that gives you a data readout it gives you basically all the data that the meter box does but it doesn’t look as nice uh but still it’s incredible to have over nothing um and they’ve just really

Nailed like a minor pdu form factor on these conjunction with uh you know OIP but the point being is compared to what I had which is just literally 1 30 amp circuit I am adding three more 240 voltage 30 amp circuit so I’ve got 120 freaking amps of juice in there uh

They’re all going to be on meter boxes and then they’re all going to have alter pdus attached to them the A1 pdu whatever I’ll link it out uh and then next to it is going to be a 120 volt circuit um I’m just this point you know

For symmetry I’m going to stop a meter box on that thing and then I’ll have ample electricity in there uh there’s a lot of room to just kind of heat soak uh that piece of the building because of the tall ceilings and I also want to

Develop a system we’re going to have to gather some data um and I’d like to actually put some old miners on there and have them basically turn on with the temperature start to dip and dip and dip and get it to a point where those miners always keep that piece of the building

Even without insulation and everything above freezing and then if I have an RV and it’s in in there I would not have to winterize it because it never actually lives it would essentially be a climate controlled garage and then in the summer months well I would just turn those old

Inefficient miners off and uh it would be fine because I probably got 30 miners that I don’t run because they are just so inefficient between how much they burn in electricity versus they earn in the cryptocurrencies they mine in conjunction with the fact I can’t even keep my profitable miners going right

Now because I’m out of space across the whole mining Farm you know I I I don’t have obviously those older inefficient ones aren’t going to be plugged in uh but I have them and they hardly even make sense to even try to sell if anything it may make sense to offload

Them in the next bow run but I don’t know Step One is I need the juice in there and then I’ll develop a system uh you know after the Fact All right so got the s19 K Pro online uh that was a previously used Miner uh so I did just hold the factory reset button uh for 5 seconds after it was online for uh at least 2 minutes and you need to do that within 10 minutes of it being turned

On and that switched it over to DHCP for me which is how I run my network at least for now and uh after that I was able to get an IP generated uh gen uh for it and now I’m able to access that Miner and so I’ve obviously just copy

And pasted my mining pool information and gotten that fired right up to my mining pool address so now it’s time to show you what does this little micro PC micro monitor thing do have in store for us oh you thought this video was crazy it’s getting even crazier let’s set it up

I am absolutely Blown Away the ETC MC basically plug-and-play Master node is one of the easiest mining devices to set up and get started with I’ve ever seen in over 7 years of doing this basically full-time I’m pretty excited to do the full video review on that but hey I’ll

Link out the device down in the video description below as well as our Discord server to connect with the community or get a head start on ordering one sooner than later uh before that video comes out don’t want to get ahead of myself right still need to do some more

Research on this but this has been on my to-do list and uh wow in other news remember that s9k we just plugged in well he’s getting brains right now he’s getting some brains that’s what they said I’d get in school but I never got any there now did

I but anyway we’ve been talking a lot about brains recently what this is such a cool device so this is a little keyboard that it came with this is the full node package this is a little monitor that I came with and the this is

You know like a micro PC uh which I I absolutely love micro PCS but this is a really cool deployment of one it’s got the shortest HDMI cable that you’ve ever seen look at that thing yeah you thought the shed was just for hard drive Drive mining oh no my

Friends this is for nodes servers anything crypto related other than big miners cuz we got other spots for those and it’s a fully clean data center is like environment with redundancy oh yeah I know I know if you’re really paying attention they’re different did you know that I take my

Shoes off when I come in here need to get a better setup for this but but how you going to have a clean place if you’re wearing your dang shoes everywhere no shoes in my house no shoes in my dang hard drive mining shed all right that’s the deal so I guess while

We’re standing here right quick update on the hard drive mining operation the juy miners have been incredibly lucky just blasting through blocks my older Evergreen miners have just kind of smoothed out they’ve been working well and then uh one of my recent Evergreen kits it’s called The Curse kit it it’s

Just not working right at all it’s 20 two hard drives was a weird setup uh three drives pretty much out of the box didn’t really work uh still having issues it won’t stay online but they have a newer higher compressed version uh that I also have here um that’s been

Doing well overall but that’s total uh beta and the performance of it has been impressive so uh that’s really the crash course on that I really I really need Chia to have a good year please please Mr Chia well never a dull moment on the boscoin mining Farm it’s been you know

The last year has really been full of just trials and tribulations right and I’ve really approached this as like a trial by F fire mentality um I mean there’s been so many changes like you see that starlink satellite uh had starlink internet a year ago go now I’m

Running off hardwire internet but it’s great to still keep that deployment here to have a backup internet option uh we’ve gone from Air cooling our M really having no cooling on our miners then having air cooling on our miners then change the plans for the gray mining shed to just become a full-blown

Immersion liquid cooled mining shed and then we have you know my little DIY mini data center out here the hard drive mine and shed uh but you know it’s going to be so much more than that I’m having so much fun with this project in particular

And I think that the vision with this is harder to see maybe I don’t talk about enough of like what I plan to do with this but I mean this doubles as a field office until we get the HQ uh you know into a better situation obviously hard

Drives with the initial Focus here uh but beyond that nodes running computers in there maybe some render work and advanced GPU type stuff and I’m not talking about oh just another GPU you mining Rick no no no like some very entrenching Computing and you may say vosque Define entrenching Computing I

Will if you subscribe and you watch the next video I’ll describe it there but BL twist I’ll probably forget so thanks for watching hope you enjoyed this update you’re on the VIN YouTube channel we keep it real um what you want to see next let me know if there’s anything I

Went over that wasn’t clear tell me um i’ I’d love to you know know and uh seriously as always I appreciate you guys take the time to tune in keep this crazy crypto Journey alive and on that note we drive off into the sunset here it comes probably freaking crash into a dry

Cooler and just have a nuclear meltdown see you I

31 Comments

  1. All of them are really nice picks. But the potential of project that elegantly combine blockchain and AI is Amazons AMS96X and should not be overlooked, I guess. Among them, this truly tackle real-world problems and have vibrant ecosystems, like Aiwork.

  2. Great detailed analysis of AMS96X! Love your work 🤝🏼🔥💎 AMS96X is definitely a sleeping giant with such a low MC with what is coming! ‬This is a project that has great potential to mint new millionaires who buy around this price… 💯

  3. Super hyped for AMS96X , a L3 DEX with native swaps between BTC, ETH, USDT, etc. (No more wrapped IOU's and massive gas fees)They use lightning and connext state channels which allow for zero gas fees, fast finality, and increased privacy. Main net coming supposedly soon, easy 100x.

  4. Finally thanks for the update! I'm trying to hold a million dollars worth of AMS96X . Oddly enough it's a sleeper for some weird reason that not many YouTubers talk about in regards to lnvesting. It has had steady growth since its release.

  5. Can't deny the fact that Amazons AMS96X is the strongest bet to bring power back to this industry after we suffered FTX, Celsius, Tera and so on. Sure if they fail it's done for good, but I don't see that the biggest tech company in the world would put everything at risk just for that.

  6. Im thinking that all my new circuits will be L6-20R's rather than 30A. The reason is that with a 3500W miner, that is around 18A when you take the 80% rule into account. So, I can't safely put 2 miners on a 30A circuit. It's cheaper to deploy twice as many 20A as 30A and will leave me in the 80% rule safely. Another benefit is a single breaker is tied to a single rig. Also, I got 2x S21's but Brains doesn't work on them. I don't know if they plan to support in the future or what the situation is.